Saturday, 11 January 2014

Chassis Build Week

In the week running up to the Christmas break, the chassis team set about turning their design into reality. The first step was to validate the design using a laser cut, mdf mock-up, shown in the picture below. This helped us check that the design meets all of the constraints, rules and regulations. Then, using templates from Steve's Solidworks model, the tubing was cut to length and the ends shaped accordingly. The main roll hoops were then bent into shape using the bending machine in the workshop. 




The roll hoops were then arranged at the correct distances apart and tacked to the welding bench. The  rails were then welded in position with the assistance of Gary the welder.



Many an hour was spent perfecting the angles and lengths, but the chassis is coming on well. The diagonals are ready to go in and the aim is to have the chassis completed before the new semester begins.


Meanwhile, Aaron, Will, Ben and Scott have been beavering away sorting out the suspension and steering geometry, along with the body work design. Renders of their work are shown below.



We would like to take this opportunity to wish all of our readers a very Happy New Year; 2014 is certainly going to be a big one for us!